Squad 2 complete (except the squad markings and still needs to be based. Table top standard only, which was a struggle as there are lots of bits I’d like to do to improve it but this is about getting 134 GSC models painted to play with, not winning a GD.

Total time for all five models was 3hrs 38mins.